{"id":9,"date":"2019-12-15T11:42:23","date_gmt":"2019-12-15T11:42:23","guid":{"rendered":"http:\/\/liftcert.co.uk\/?page_id=9"},"modified":"2025-05-31T17:17:54","modified_gmt":"2025-05-31T17:17:54","slug":"services","status":"publish","type":"page","link":"http:\/\/liftcert.co.uk\/?page_id=9","title":{"rendered":"Services"},"content":{"rendered":"\n<h4>New Passenger Lifts<\/h4>\n\n\n\n<p>There are various ways in which a new passenger lift many be assessed and declared in conformity with the Lifts Regulations 2016.  Lift Cert Ltd is approved for review and approval of all these alternatives within the UK as listed below:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th> <strong>Lifts Regulations<\/strong> <\/th><th><strong>Schedule<\/strong><\/th><th> <strong>Lifts Directive <\/strong><br><strong>(2014\/33\/EU)<\/strong> <\/th><\/tr><\/thead><tbody><tr><td>Type Examination of a Model Lift<\/td><td>11<\/td><td>Annex IV(b)<\/td><\/tr><tr><td>Product Quality Assured Safety Components<\/td><td>13<\/td><td>Annex VI<\/td><\/tr><tr><td>Full Quality Assured Safety Components<\/td><td>14<\/td><td>Annex VII<\/td><\/tr><tr><td>Unit Verification of Installed Lift<\/td><td>15<\/td><td>Annex VIII<\/td><\/tr><tr><td>Conformity &amp; Random checking of Safety Components<\/td><td>16<\/td><td>Annex IX<\/td><\/tr><tr><td>Product Quality Assurance<\/td><td>17<\/td><td>Annex X<\/td><\/tr><tr><td>Full Quality Assurance<\/td><td>18<\/td><td>Annex XI<\/td><\/tr><tr><td>Production Quality Assurance<\/td><td>19<\/td><td>Annex XII<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4>Lifts and Vertical Lifting Platforms (under the Supply of Machinery (Safety) Regulations 2008)<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Supply of Machinery (Safety) Regulations 2008<\/th><th>Machinery Directive (2006\/42\/EC)<\/th><\/tr><\/thead><tbody><tr><td>Schedule 2 Part 4(17) <\/td><td>Annex IV (17)<\/td><\/tr><tr><td>Schedule 2 Part 9 Type Examination<\/td><td>Annex IX<\/td><\/tr><tr><td>Schedule 2 Part 10 Full Quality Assurance<\/td><td>Annex X<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4>Useful Documents and Links<\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><a href=\"http:\/\/ec.europa.eu\/docsroom\/documents\/29961\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"Guidelines (opens in a new tab)\">Guidelines<\/a><br>(pdf)<\/td><td>Guide to application of the Lifts Directive 2014\/33\/EU<\/td><\/tr><tr><td><a href=\"http:\/\/liftcert.co.uk\/wp-content\/uploads\/2025\/05\/LC030-APPROVED-BODY-Scheme-Rules-Issue-25.pdf\" data-type=\"URL\" target=\"_blank\" rel=\"noreferrer noopener\">Approved Body Scheme Rules<\/a><br>(pdf)<\/td><td>Lift Cert Ltd Scheme Rules for Approved Body<br><\/td><\/tr><tr><td><a href=\"http:\/\/liftcert.co.uk\/wp-content\/uploads\/2025\/05\/LC049-SCHEME-RULES-Certification-16-4.4.25.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Certification of Management Systems Scheme Rules<\/a><br>(pdf)<\/td><td>Lift Cert Ltd Scheme Rules for Certification of Management Systems<br><\/td><\/tr><tr><td><a href=\"http:\/\/liftcert.co.uk.c51.previewmysite.eu\/wp-content\/uploads\/2023\/05\/Modern-Slavery-and-Human-Trafficking-Statement.pdf\" data-type=\"URL\" target=\"_blank\" rel=\"noreferrer noopener\">Modern Slavery and Human Trafficking Statement<\/a><br>(pdf)<\/td><td>Modern Slavery and Human Trafficking Statement<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Passenger Lifts There are various ways in which a new passenger lift many be assessed and declared in conformity with the Lifts Regulations 2016. Lift Cert Ltd is approved for review and approval of all these alternatives within the UK as listed below: Lifts Regulations Schedule Lifts Directive (2014\/33\/EU) Type Examination of a Model &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/liftcert.co.uk\/?page_id=9\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Services&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/9"}],"collection":[{"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9"}],"version-history":[{"count":21,"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/9\/revisions"}],"predecessor-version":[{"id":171,"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/9\/revisions\/171"}],"wp:attachment":[{"href":"http:\/\/liftcert.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}